Skip to main content

Upgrade existing River Douglas footpath

From "West Wigan Engagement"

Go to the project

Upgrade to a shared footpath the existing riverside footpath which runs from Loire Drive (behind Asda) and connect up with the existing roadside cycle lane on the Saddle junction.

Comments

Commenting is not possible because this project is currently not active.

Share

Posted by

Current status

proposed